💧 Hydro · Operational

HE Lešće

Generalski Stol, Croatia
Koordinate: približne (razina grada)
Investitor:HEP

42,29 MW

8.500 MWh/mo

Pušteno u pogon

2010

Tip postrojenja

Reservoir

Turbina

Francis

Broj jedinica

3

Protok

122,70 m³/s

Centar proizvodnje Zapad

Dam-toe plant on the Donja Dobra (formed by the confluence of the two rivers HE Gojak uses), downstream of Ogulin near Lesce/Generalski Stol -- the "second energy step" on the Dobra after Gojak, whose own reservoir/tailrace continues directly into this one. First hydro plant built in Croatia since independence; construction started 2005, operational 2010. Highly automated, remotely operated from HE Gojak's control room. 2 main units (2x20.6MW, flow 2x60 m3/s, connected at 110kV) plus 1 biological-minimum (ABM) unit (1.09MW, flow 2.7 m3/s, connected at 35kV) -- aggregated into one row per this project's composite-plant convention (matches HEP's own combined "42.29 MW" narrative figure). Average annual production ~102 GWh (2010-2016). Runs an adjusted summer regime 1 June - 15 Sept (see lesce.hep.hr for downstream flow info). Part of GHE Gojak (with HE Gojak and HE Ozalj 1/2), under Centar proizvodnje Zapad. Coordinates are a town-level estimate (Generalski Stol), not plant-exact.

Izvor podataka: https://www.hep.hr/proizvodnja/hidroelektrane-1528/pp-he-zapad/he-lesce/1543

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik HEP Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.