25,7 MWp
2.248 MWh/mo
Pušteno u pogon
2010
25.7 MWp solar park in Bavarian Swabia, completed 2010, built by Gehrlicher Solar AG. Annual output 26.98 GWh/yr (MonthlyMwh = 26,980/12 = 2,248.33). Site area 63 ha (155.7 acres).
Izvor podataka: https://list.solar/plants/largest-plants/solar-plants-germany/
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | Gehrlicher Solar AG | Unclaimed |