Preskoči na glavni sadržaj

💧 Hydro · Operational

HE Gojak

Ogulin, Croatia
Koordinate: približne (razina grada)
Investitor:HEP

56 MW

16.500 MWh/mo

Pušteno u pogon

1954

Tip postrojenja

Reservoir

Turbina

Francis

Broj jedinica

3

Pad

109,0 m

Protok

57,00 m³/s

Akumulacija

Sabljaci / Bukovnik

Centar proizvodnje Zapad

High-pressure derivation plant 5km NE of Ogulin, drawing on two sinking rivers (Zagorska Mreznica and Ogulinska Dobra), dammed into the Sabljaci and Bukovnik reservoirs and carried to the turbines by a 9,386m underground tunnel. Built 1954-1959 (originally 48MW design, net head 118m, flow 50 m3/s). Original units rated 22.5/18.6/18.6 MW; fully revitalized 2000-2019 (new turbines 2006-2014: Francis, vertical, 24.1MW/20.5 m3/s rated each; new generators 2017-2019) -- 56MW remains HEP's stated "currently available" capacity despite the higher-rated new turbines, likely generator-limited; noted here rather than resolved. Constructive net head after revitalization 109m, installed flow 3x19 m3/s. Average annual production 198 GWh over its full operating life, ~213.5 GWh 2007-2017 post-turbine-replacement; ~12 TWh produced in total. Weekly-regulation reservoir capacity. Leading plant of GHE Gojak (with HE Lesce and HE Ozalj 1/2), under Centar proizvodnje Zapad. Coordinates are a town-level estimate (Ogulin), not plant-exact.

Izvor podataka: https://www.hep.hr/proizvodnja/hidroelektrane-1528/pp-he-zapad/he-gojak/1542

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik HEP Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.