56,5 MWp
Financiranje
Planned with EBRD support (procurement per EBRD rules)
Priključak na mrežu
45 MW
Planned on cadastral parcels 645/1 and 645/5 in the Sukosan cadastral area -- about 3 km northeast of Sukosan, 1.5 km north of Debeljak, and 2 km south of Zadar Airport. Roughly 54.8 ha site. Includes a new 110/33 kV Sukosan substation connecting to the existing DV 110 kV Zadar - Istok Biograd transmission line. Battery storage (BESS) planned at up to 50 MW power / 200 MWh capacity (the 200 MWh capacity figure is in BatteryKwh; the 50 MW power rating has no dedicated column and is noted here). Location permit already obtained; building permit expected Q2 2026; ready-to-build status planned Q4 2026. No named investor/EPC/designer/O&M stated on the source page as of this scrape.
Izvor podataka: https://www.hep.hr/projekti/obnovljivi-izvori-energije/suncana-elektrana-sukosan/3882
Strane i prijave uloga
0Za ovaj oglas još nema podataka o stranama.