Preskoči na glavni sadržaj

💧 Hydro · Operational

HE Sklope

Kosinjsko polje, Croatia
Koordinate: približne (razina grada)
Investitor:HEP

22,5 MW

7.083 MWh/mo

Pušteno u pogon

1970

Tip postrojenja

Reservoir

Turbina

Francis

Broj jedinica

1

Pad

70,0 m

Protok

45,00 m³/s

Akumulacija

Kruščica

Volumen akumulacije

128,00 hm³

Visina brane

81,0 m

Centar proizvodnje Zapad

Dam-toe plant on the Lika river at Kosinjsko polje, whose Kruscica reservoir (128 hm3 useful volume, embankment dam 81m high / 210m crest, spillway capacity 1,300 m3/s) feeds toward HE Senj downstream. 1 vertical Francis unit, 23.5 MW turbine / 22.5 MW generator, flow 45 m3/s. Built in just under 1.5 years, first spin October 1969, grid-synchronized January 1970. The Lika basin above Kosinjski most covers 1,125 km2 (975 km2 to the Kruscica reservoir itself). Average annual production ~85 GWh (max 132 GWh in 2014). Part of GHE Senj (with HE Senj), under Centar proizvodnje Zapad. Coordinates are a town-level estimate (Kosinjsko polje), not plant-exact.

Izvor podataka: https://www.hep.hr/proizvodnja/hidroelektrane-1528/pp-he-zapad/he-sklope/1541

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik HEP Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.