🌀 Wind · Commissioning
Vjetroelektrana Opor
27 MW
Priključak na mrežu
27 MW
HOPS classifies this as "pokusni rad" (testing/trial operation) -- built and grid-connected, not yet full commercial operation (Trajni pogon not yet granted); stored as Status='Commissioning', this DB's dedicated bucket for that lifecycle state. Located in the municipalities of Prgomet and Lećevica (and touching the City of Kaštela), Split-Dalmatia County. CommissionYear left NULL per HOPS. 6x Nordex Delta4000 turbines, 4.5 MW each = 27 MW exactly (matches HOPS installed figure), steel tower hub height 105m, rotor diameter 149m -- part of the same Nordex Delta4000 turbine family and construction campaign as the adjacent, larger, SEPARATE Boraja II project (45 MW, ~10 more turbines of the same model/rating -- 6+10=16 total matches a press figure for "16 Nordex turbines" across both projects combined); Boraja II is a distinct plant, not imported here. OWNERSHIP: Vjetroelektrana Opor d.o.o. (Split, OIB 33479085411, founded 21.11.2012) is 100%-owned by ACCIONA ENERGÍA GLOBAL, S.L. (Spain) per a live fininfo.hr lookup, and is the current HERA electricity-production licensee of record (license issued 27.04.2026). Expected combined annual production (Opor + Boraja II together) ~176.49 GWh/yr, supplying ~41,500 households -- NOT split into a per-plant MonthlyMwh figure here since no Opor-only generation figure was found (a proportional- capacity estimate was deliberately not applied). Combined investment for Opor + Boraja II reported as ~EUR 100 million (tockanai.hr) -- also not split into a per-plant BuildCostEur. No plant-specific coordinate found -- Lat/Lng is thewindpower.net's own entry for this project, explicitly marked NOT precise on their site -- CoordPrecision=Approximate.
Izvor podataka: https://www.vjetroelektranaopor-boraja.com/
Izvor podataka: https://tockanai.hr/biznis/acciona-energia-ulaze-100-milijuna-eura-u-vjetroelektrane-opor-i-boraja-ii-60746/
Izvor podataka: https://www.fininfo.hr/Poduzece/Pregled/vjetroelektrana-opor/Detaljno/247467
Izvor podataka: https://www.thewindpower.net/windfarm_map_en_17261_opor.php
Izvor podataka: https://www.antenazadar.hr/clanak/2025/08/sve-vise-vjetroelektrana-raste-im-brojka-na-jadranu-prednjace-sibensko-kninska-i-zadarska-zupanija/
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | Vjetroelektrana Opor d.o.o. | Unclaimed |