🌀 Wind · Operational
Vjetroelektrana Lukovac
48,75 MW
Pušteno u pogon
2018
Priključak na mrežu
48 MW
Built January-July 2017 on a plateau between the Umac (684m) and Jaram-Lukovac (764m) hills in Cista Provo municipality, elevation 520-770m. Privileged-producer status granted 27 March 2018 (matching HOPS's 2018 commissioning year). 16 turbines, mixed fleet: 7x GE 2.85-103 (2.85 MW each) + 9x GE 3.2-103 (3.2 MW each) = 19.95 + 28.80 = 48.75 MW exact match to HOPS's installed figure. Rotor diameter 103m consistent across both models (shared "-103" suffix); hub height 98.3m sourced. Builder: ING-GRAD d.o.o. (EPC claim added below; this is ING-GRAD's 2nd appearance in this DB after Korlat's grid-connection works, migration 018 -- a candidate for a future Partner row if the driver wants to promote EPC-recurring companies, out of scope for this owner-only import). NO annual production (GWh) figure found -- the only numbers located (94,224-123,635 MWh/yr) are PRE-CONSTRUCTION WIND-RESOURCE PROJECTIONS at two candidate hub heights from an environmental-monitoring document (oikon.hr), not measured post-commissioning output -- deliberately NOT used for MonthlyMwh per this project's anti-fabrication rule (measured output only). BuildCostEur also not found -- left NULL. Owner confirmed via the Croatian court/FINA registry: Vjetroelektrana Lukovac d.o.o. (Zagreb, OIB 42275851184, MB 02275694), founder/sole member Balkan Energies - Croatia 1 B.V. (Netherlands) -- matches the producer name already in this project's own dbo.Hrote table.
Izvor podataka: https://hr.wikipedia.org/wiki/Vjetroelektrana_Lukovac
Izvor podataka: https://www.ing-grad.hr/hr/component/content/article/vjetroelektrana-lukovac?catid=133&layout=blog&Itemid=510
Izvor podataka: https://www.fininfo.hr/Poduzece/Pregled/vjetroelektrana-lukovac/Detaljno/92974
Strane i prijave uloga
2| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| EPC izvođač | ING-GRAD d.o.o. | Unclaimed | ||
| Vlasnik | Vjetroelektrana Lukovac d.o.o. | Unclaimed |