🌀 Wind · Operational
Vjetroelektrana Glunča
20,7 MW
4.417 MWh/mo
Pušteno u pogon
2016
Priključak na mrežu
22 MW
Located near the village of Boraja, next to Sibenik. Put into operation 2016. 9x Siemens turbines, 2.3 MW each = 20.7 MW exact match; specific Siemens model number not found. Rotor diameter 108m explicitly sourced (53m blade length -> stated 108m total rotor diameter); hub height not found, left NULL. Annual production ~53 GWh/yr, ~15,000 households (MonthlyMwh = 53,000/12 = 4,416.67). No investment figure found anywhere -- BuildCostEur left NULL. COORDINATE CAVEAT: neither Wikipedia nor fininfo published coordinates for this plant; the figure used (43.639028, 16.073533) comes from Global Energy Monitor, itself citing an archived Google Maps pin, not a primary site survey -- CoordPrecision='Approximate' reflects that, unlike the other 8 plants in this batch which all resolved to a primary-source Exact coordinate. Owner confirmed via the Croatian court/FINA registry: Vjetroelektrane Glunca d.o.o. (Savska Opatovina 36, Zagreb, OIB 79006291606, MB 02060671, founded 2006), majority-owned by PETROL Slovenska energetska druzba, d.d. (Slovenia) -- matches the producer name already in this project's own dbo.Hrote table.
Izvor podataka: https://hr.wikipedia.org/wiki/Vjetroelektrana_Glun%C4%8Da
Izvor podataka: https://www.fininfo.hr/Poduzece/Pregled/vjetroelektrane-glunca/Detaljno/100367
Izvor podataka: https://www.gem.wiki/Glunca_wind_farm
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | Vjetroelektrane Glunča d.o.o. | Unclaimed |