Preskoči na glavni sadržaj

🌀 Wind · Operational

Vjetroelektrana Glunča

Šibenik, Croatia
Koordinate: približne (razina grada)

20,7 MW

4.417 MWh/mo

Pušteno u pogon

2016

Priključak na mrežu

22 MW

Located near the village of Boraja, next to Sibenik. Put into operation 2016. 9x Siemens turbines, 2.3 MW each = 20.7 MW exact match; specific Siemens model number not found. Rotor diameter 108m explicitly sourced (53m blade length -> stated 108m total rotor diameter); hub height not found, left NULL. Annual production ~53 GWh/yr, ~15,000 households (MonthlyMwh = 53,000/12 = 4,416.67). No investment figure found anywhere -- BuildCostEur left NULL. COORDINATE CAVEAT: neither Wikipedia nor fininfo published coordinates for this plant; the figure used (43.639028, 16.073533) comes from Global Energy Monitor, itself citing an archived Google Maps pin, not a primary site survey -- CoordPrecision='Approximate' reflects that, unlike the other 8 plants in this batch which all resolved to a primary-source Exact coordinate. Owner confirmed via the Croatian court/FINA registry: Vjetroelektrane Glunca d.o.o. (Savska Opatovina 36, Zagreb, OIB 79006291606, MB 02060671, founded 2006), majority-owned by PETROL Slovenska energetska druzba, d.d. (Slovenia) -- matches the producer name already in this project's own dbo.Hrote table.

Izvor podataka: https://hr.wikipedia.org/wiki/Vjetroelektrana_Glun%C4%8Da

Izvor podataka: https://www.fininfo.hr/Poduzece/Pregled/vjetroelektrane-glunca/Detaljno/100367

Izvor podataka: https://www.gem.wiki/Glunca_wind_farm

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik Vjetroelektrane Glunča d.o.o. Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.