4,5 MW
241 MWh/mo
Pušteno u pogon
1957
Tip postrojenja
Pumped-storage
Turbina
Francis
Broj jedinica
1
Pad
59,0 m
Protok
9,90 m³/s
Akumulacija
Lokvarka
Volumen akumulacije
34,82 hm³
Centar proizvodnje Zapad
Reversible pumping derivation plant near Fuzine, by the Bajer accumulation lake, part of the HE Vinodol water supply system. 4.5 MW generating / -6.5 MW pumping (CapacityKw uses the generating-mode figure). 1 triple unit: a Francis turbine driving a generator, plus a centrifugal pump on the same generator in motor mode. Gross head 23-59m (created by the Lokvarka embankment dam). Pumps surplus Licanka river water into Lokvarka lake (34.82 hm3 useful volume), partially regulating the Licanka's flow. Average annual production ~2.89 GWh. Revitalized 2017. Part of "HE Gorski kotar" (with RHE Lepenica and HE Zeleni vir), under GHE Vinodol / Centar proizvodnje Zapad. Coordinates are a town-level estimate (Fuzine), not plant-exact.
Izvor podataka: https://www.hep.hr/proizvodnja/hidroelektrane-1528/pp-he-zapad/che-fuzine/1537
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | HEP | Unclaimed |