🌀 Wind · Operational

Vjetroelektrana Jelinak

Marina, Croatia

30 MW

6.750 MWh/mo

Pušteno u pogon

2013

Trošak izgradnje

€48.000.000

Priključak na mrežu

30 MW

Located in the Blizna-Bristivica area of the Trogir hinterland, straddling the Marina and Seget municipalities (City field uses Marina; Seget co-location noted here per HOPS's "Marina, Seget" municipality listing). Construction March-November 2012, officially opened by President Ivo Josipovic on 6 September 2013. Was the largest Croatian wind farm by turbine count at the time. 20x Acciona AW-82/1500 turbines, 1.5 MW each (30 MW exact), steel towers 80m high (built at the Brodosplit shipyard, Split), rotor diameter 82m. Annual production ~81 GWh/yr, ~30,000 households (MonthlyMwh = 81,000/12 = 6,750.00). Investment EUR 48 million; investor built and financed the 110kV substation, connected to the HEP OPS grid. Owner confirmed via the Croatian court/FINA registry: Vjetroelektrana Jelinak d.o.o. (Zrinjsko-Frankopanska 64, Split, OIB 39041138379, founded 2002), wholly owned ("jedini clan") by ACCIONA ENERGIA INTERNATIONAL, S.A. (Spain) -- matches the producer name already in this project's own dbo.Hrote table.

Izvor podataka: https://hr.wikipedia.org/wiki/Vjetroelektrana_Jelinak

Izvor podataka: https://www.fininfo.hr/Poduzece/Pregled/vjetroelektrana-jelinak/Detaljno/40148

Izvor podataka: https://www.marina.hr/vjetroelektrana-jelinak/

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik Vjetroelektrana Jelinak d.o.o. Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.