🌀 Wind · Operational
Vjetroelektrana Jelinak
30 MW
6.750 MWh/mo
Pušteno u pogon
2013
Trošak izgradnje
€48.000.000
Priključak na mrežu
30 MW
Located in the Blizna-Bristivica area of the Trogir hinterland, straddling the Marina and Seget municipalities (City field uses Marina; Seget co-location noted here per HOPS's "Marina, Seget" municipality listing). Construction March-November 2012, officially opened by President Ivo Josipovic on 6 September 2013. Was the largest Croatian wind farm by turbine count at the time. 20x Acciona AW-82/1500 turbines, 1.5 MW each (30 MW exact), steel towers 80m high (built at the Brodosplit shipyard, Split), rotor diameter 82m. Annual production ~81 GWh/yr, ~30,000 households (MonthlyMwh = 81,000/12 = 6,750.00). Investment EUR 48 million; investor built and financed the 110kV substation, connected to the HEP OPS grid. Owner confirmed via the Croatian court/FINA registry: Vjetroelektrana Jelinak d.o.o. (Zrinjsko-Frankopanska 64, Split, OIB 39041138379, founded 2002), wholly owned ("jedini clan") by ACCIONA ENERGIA INTERNATIONAL, S.A. (Spain) -- matches the producer name already in this project's own dbo.Hrote table.
Izvor podataka: https://hr.wikipedia.org/wiki/Vjetroelektrana_Jelinak
Izvor podataka: https://www.fininfo.hr/Poduzece/Pregled/vjetroelektrana-jelinak/Detaljno/40148
Izvor podataka: https://www.marina.hr/vjetroelektrana-jelinak/
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | Vjetroelektrana Jelinak d.o.o. | Unclaimed |