Preskoči na glavni sadržaj

🌀 Wind · Operational

Vjetroelektrana Crno Brdo

Šibenik, Croatia

10,5 MW

2.250 MWh/mo

Pušteno u pogon

2011

Trošak izgradnje

€16.000.000

Priključak na mrežu

10 MW

Located a few kilometres north of the A1 motorway between the Sibenik and Vrpolje exits, near the existing Trtar-Krtolin and Orlice wind farms. Commissioned 24 August 2011. 7x Leitwind LTW77 turbines, 1.5 MW each (10.5 MW nameplate), rotor diameter 77m, hub height 80m -- output capped at 10.0 MW by the HEP-ODS distribution network's connection limit, matching HOPS's Installed=10.5/ Approved connection=10 figures exactly. Annual production ~27 GWh/yr (MonthlyMwh = 27,000/12 = 2,250.00). Investment ~EUR 16 million (consistent across independent sources). Owner confirmed directly via the Croatian court/FINA registry: Vjetroelektrana Crno Brdo d.o.o. (Krapanjska cesta 8, Sibenik, OIB 02826763846, founded 2006) -- matches the producer name already in this project's own dbo.Hrote table. Registered shareholders on record: Slaven Tudic, Goran Frzop, Tomislav Belamaric, Orient Green Power (Europe) B.V. (Netherlands), and TEC Obnovljivi izvori d.o.o. -- a multi-party cap table, not a clean single parent, so none of these individual shareholders is modelled as a separate Partner row.

Izvor podataka: https://hr.wikipedia.org/wiki/Vjetroelektrana_Crno_brdo

Izvor podataka: https://www.fininfo.hr/Poduzece/Pregled/vjetroelektrana-crno-brdo/Detaljno/100366

Izvor podataka: http://www.vjetroelektrane.com/vjetroelektrane-u-regiji/590-vjetroelektrana-crno-brdo

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik Vjetroelektrana Crno Brdo d.o.o. Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.