🌀 Wind · Operational
Vjetroelektrana Crno Brdo
10,5 MW
2.250 MWh/mo
Pušteno u pogon
2011
Trošak izgradnje
€16.000.000
Priključak na mrežu
10 MW
Located a few kilometres north of the A1 motorway between the Sibenik and Vrpolje exits, near the existing Trtar-Krtolin and Orlice wind farms. Commissioned 24 August 2011. 7x Leitwind LTW77 turbines, 1.5 MW each (10.5 MW nameplate), rotor diameter 77m, hub height 80m -- output capped at 10.0 MW by the HEP-ODS distribution network's connection limit, matching HOPS's Installed=10.5/ Approved connection=10 figures exactly. Annual production ~27 GWh/yr (MonthlyMwh = 27,000/12 = 2,250.00). Investment ~EUR 16 million (consistent across independent sources). Owner confirmed directly via the Croatian court/FINA registry: Vjetroelektrana Crno Brdo d.o.o. (Krapanjska cesta 8, Sibenik, OIB 02826763846, founded 2006) -- matches the producer name already in this project's own dbo.Hrote table. Registered shareholders on record: Slaven Tudic, Goran Frzop, Tomislav Belamaric, Orient Green Power (Europe) B.V. (Netherlands), and TEC Obnovljivi izvori d.o.o. -- a multi-party cap table, not a clean single parent, so none of these individual shareholders is modelled as a separate Partner row.
Izvor podataka: https://hr.wikipedia.org/wiki/Vjetroelektrana_Crno_brdo
Izvor podataka: https://www.fininfo.hr/Poduzece/Pregled/vjetroelektrana-crno-brdo/Detaljno/100366
Izvor podataka: http://www.vjetroelektrane.com/vjetroelektrane-u-regiji/590-vjetroelektrana-crno-brdo
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | Vjetroelektrana Crno Brdo d.o.o. | Unclaimed |