🌀 Wind · Operational

Vjetroelektrana Krš Pađene

Ervenik, Croatia
Investitor:C.E.M.P. d.o.o.

144 MW

40.000 MWh/mo

Pušteno u pogon

2021

Priključak na mrežu

142 MW

HOPS official monthly report: installed 144 MW, approved connection 142 MW at 220 kV, operational since 2021 (test operation from 2019). Ervenik municipality, near Knin, Šibensko-kninska County -- Croatia's largest wind farm, 48 turbines across ~2,000 hectares. CAPACITY DISCREPANCY FLAG: every independent public source checked (hr.wikipedia raw table, Global Energy Monitor, OpenInfraMap, multiple press articles) consistently reports 142 MW as this plant's capacity, not 144 MW -- HOPS's 144 MW installed figure is used here per the ground-truth instruction for this import, but the gap vs. every other source is noted rather than silently absorbed. Turbines: 48x Nordex (brand confirmed via hr.wikipedia's own wind-farm table; specific submodel e.g. N117/N131 NOT found despite searching -- left unspecified rather than guessed). Press reports 132m tower height / ~200m blade-tip height, which would imply a rotor radius around 68m, but this is an indirect back-calculation from imprecise press language (tower vs. hub height are not necessarily the same figure) -- NOT stored as HubHeightM/RotorDiameterM to avoid fabricating a derived number; both left NULL. Predicted annual production 480 GWh/yr per hr.wikipedia's table (marked "predviđeno" = projected/design figure, not a confirmed measured actual) -- MonthlyMwh = 480,000/12 = 40,000.00, flagged here as a projected rather than measured figure. Owner: C.E.M.P. d.o.o. (OIB 80708915943, MB 01743392, Trgovačka ulica 3, Donji Stupnik, founded 2003, large enterprise) -- exact match to the Hrote producer record. 100%-owned per Global Energy Monitor by Lager Group -- Croatian press (tportal, tris.com.hr, forbes.n1info.hr) identifies the controlling businessman as Milenko Bašić (Posušje, Bosnia and Herzegovina). Note: this project has been the subject of extensive Croatian press coverage re: unpaid municipal utility fees to Ervenik/Knin and a 2024 USKOK arrest-related investigation -- purely reputational/legal context, not incorporated into any stored field. TWO-PHASE NOTE: this project's own dbo.Hrote table has TWO registrations under producer "C.E.M.P. d.o.o." ("Vjetroelektrana Krs Paene" and "Vjetroelektrana Krs Paene-Prosirenje" [expansion]), consistent with HOPS's single 144 MW entry representing both phases combined.

Izvor podataka: https://www.gem.wiki/KRS-Padene_wind_farm

Izvor podataka: https://hr.wikipedia.org/wiki/Vjetroelektrane_u_Hrvatskoj

Izvor podataka: https://openinframap.org/stats/area/Croatia/plants/-10180789

Izvor podataka: https://www.tportal.hr/vijesti/clanak/vjetropark-krs-padene-trebao-je-biti-zlatna-koka-za-lokalnu-zajednicu-knin-i-ervenik-dosad-nisu-dobili-ni-centa-20230314

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik C.E.M.P. d.o.o. Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.