🌀 Wind · Operational
Vjetroelektrana Jasenice
11,5 MW
1.833 MWh/mo
Pušteno u pogon
2020
Trošak izgradnje
€15.000.000
Priključak na mrežu
10 MW
HOPS official monthly report: installed 11.5 MW, approved connection 10 MW at 35 kV, operational since 2020. Near the hamlet of Bobija, Jasenice municipality, Zadar hinterland below Velebit. 5x Enercon E-70/2300 turbines (2.3 MW each = 11.5 MW nameplate, matching HOPS's installed figure exactly), rotor diameter 71m; hub height not found in sourced material, left NULL. Opened January 2020 (grid-connected), ~22 GWh/yr, ~6,000 households (MonthlyMwh = 22,000/12 = 1,833.33). Investment EUR 15 million. TWO-PHASE NOTE: this project's own dbo.Hrote table has TWO registrations under producer "VJETROPARK JASENICE d.o.o." -- "Jasenice (druga faza)" [2nd phase] and "Kompleks male vjetroelektrane" [small-plant complex, phase 1] -- consistent with HOPS treating this as ONE 11.5 MW entry; the 5-turbine/11.5 MW total found here likely represents both Hrote phases combined into a single built plant, though no source explicitly breaks out the phase-1/phase-2 MW split. Owner: VJETROPARK JASENICE d.o.o. (OIB 27281247593, MB 01364979, Podudbina 15, Udbina, founded 1998) -- exact match to the Hrote producer record. Sole member: Kelag International Ljubljana, energetski inženiring d.o.o. (Slovenia) -- Kelag/Interenergo group (Austrian Kelag's Slovenian renewable-energy arm), management David Huber/Zvonka Schmit, prokurist Bernd Neuner.
Izvor podataka: https://www.thewindpower.net/windfarm_en_30834_jasenice.php
Izvor podataka: https://oie.hr/u-zadarskom-zaledu-pusten-u-pogon-vjetropark-jasenice/
Izvor podataka: https://www.energetika-net.com/obnovljivi-izvori/otvorena-vjetroelektrana-jasenice-i-29854
Izvor podataka: https://www.fininfo.hr/Poduzece/Pregled/vjetropark-jasenice/Detaljno/29617
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | VJETROPARK JASENICE d.o.o. | Unclaimed |