💧 Hydro · Operational

HE Vinodol

Tribalj, Croatia
Koordinate: približne (razina grada)
Investitor:HEP

90 MW

11.388 MWh/mo

Pušteno u pogon

1952

Tip postrojenja

Reservoir

Turbina

Pelton

Broj jedinica

3

Pad

658,0 m

Protok

18,60 m³/s

Akumulacija

Bajer

Centar proizvodnje Zapad

High-pressure reservoir plant in Tribalj, hinterland of Crikvenica. Draws on the combined Lokvarka and Licanka river system via the Bajer accumulation lake, topped up by CHE Fuzine and RHE Lepenica. Gross head 658m -- one of the highest achieved in any European hydro plant. 3 units, each 2 horizontal Pelton turbines + 1 generator, 31.5 MW installed per unit. Average annual production ~136.66 GWh. Also has a 470 kVA house Pelton generator. Leading plant of GHE Vinodol (with HE Rijeka and HE Gorski kotar's 3 plants), under Centar proizvodnje Zapad. Provides ancillary services (automatic secondary regulation, tertiary regulation, black start, island operation). Coordinates are a town-level estimate (Tribalj), not plant-exact.

Izvor podataka: https://www.hep.hr/proizvodnja/hidroelektrane-1528/pp-he-zapad/he-vinodol/1536

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik HEP Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.