💧 Hydro · Operational
HE Vinodol
90 MW
11.388 MWh/mo
Pušteno u pogon
1952
Tip postrojenja
Reservoir
Turbina
Pelton
Broj jedinica
3
Pad
658,0 m
Protok
18,60 m³/s
Akumulacija
Bajer
Centar proizvodnje Zapad
High-pressure reservoir plant in Tribalj, hinterland of Crikvenica. Draws on the combined Lokvarka and Licanka river system via the Bajer accumulation lake, topped up by CHE Fuzine and RHE Lepenica. Gross head 658m -- one of the highest achieved in any European hydro plant. 3 units, each 2 horizontal Pelton turbines + 1 generator, 31.5 MW installed per unit. Average annual production ~136.66 GWh. Also has a 470 kVA house Pelton generator. Leading plant of GHE Vinodol (with HE Rijeka and HE Gorski kotar's 3 plants), under Centar proizvodnje Zapad. Provides ancillary services (automatic secondary regulation, tertiary regulation, black start, island operation). Coordinates are a town-level estimate (Tribalj), not plant-exact.
Izvor podataka: https://www.hep.hr/proizvodnja/hidroelektrane-1528/pp-he-zapad/he-vinodol/1536
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | HEP | Unclaimed |