💧 Hydro · Planned
HE Renke
33 MW
11.153 MWh/mo
Tip postrojenja
Run-of-river
PLANNED, NOT BUILT -- same National Spatial Plan project as HE Suhadol/HE Trbovlje, no construction-start date on source. Design capacity 33 MW (2 x 16.5 MW); projected average annual production 133.84 GWh/yr -> MonthlyMwh = 133,840/12 = 11,153.33 (design/projected figures, not measured). Located approx. 200m downstream of the wooden footbridge over the Sava in Renke, near Mošenik. Part of the same 3-plant Middle Sava chain described in HE Suhadol's Notes. Coordinates are a Renke-settlement estimate (Wikipedia infobox), close to the source's own ~200m-downstream description -- among the more precise of the 3 estimates in this import.
Izvor podataka: https://www.hse.si/en/hse-projects/middle-sava-hpp/
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | Holding Slovenske Elektrarne d.o.o. | Unclaimed |