💧 Hydro · Planned

HE Suhadol

Podkraj, Hrastnik, Slovenia
Koordinate: približne (razina grada)

35,5 MW

12.103 MWh/mo

Tip postrojenja

Run-of-river

PLANNED, NOT BUILT -- design-stage project on Slovenia's National Spatial Plan, no construction-start date on source. Design capacity 35.5 MW (2 x 17.75 MW); projected average annual production 145.24 GWh/yr -> MonthlyMwh = 145,240/12 = 12,103.33 (these are HSE's own DESIGN/PROJECTED figures, NOT measured operational output). Located at Podkraj on the right bank of the Sava, approx. 2.5km downstream of the road bridge over the Sava in Hrastnik (below Kajič). Part of a 3-plant chain (with HE Trbovlje and HE Renke) on a 26km stretch of the Sava between Litija and Zidani Most, across the municipalities of Litija, Zagorje ob Savi, Trbovlje, Hrastnik and Laško -- framed by HSE as key to the Zasavska region's energy self-sufficiency and Slovenia's National Energy and Climate Plan target (27% renewable generation, 75% domestic sources by 2030). Coordinates are a Podkraj-settlement estimate (Wikipedia infobox), not the exact dam-site location, which the source itself places ~2.5km further downstream.

Izvor podataka: https://www.hse.si/en/hse-projects/middle-sava-hpp/

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik Holding Slovenske Elektrarne d.o.o. Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.