☀ Solar · Operational

SPP Hubelj

Ajdovščina, Slovenia

55 kWp

6 MWh/mo

Pušteno u pogon

2020

CAPACITY DISCREPANCY -- LARGE, NOT COSMETIC, FLAGGED PROMINENTLY: HSE's own summary table gives 55 kWp, but that same page's detail-section HEADER says "71.04 kWp", and the module math confirms the larger figure exactly (222 single-crystal modules x 320 Wp = 71,040 W = 71.04 kWp) -- a 29% gap between HSE's own two numbers on the same page, NOT a rounding artifact like Dravograd/ OCV3/Gimnazija Velenje above. Per this project's established convention (table figure as the primary CapacityKw field even when the source disagrees with itself -- same handling as the Hrvatske vode small-hydro import's Pleternica/Fajerov Mlin/Dabrova Dolina/Brodski Drenovac discrepancies), CapacityKw = 55 kWp (the table figure). REVIEW THIS if a more authoritative capacity is ever found -- the 71.04 kWp figure is not a fabrication, it is HSE's own stated number for the same plant. Annual production 73 MWh/yr (0.073 GWh) -> MonthlyMwh = 73/12 = 6.08. Located on the roof of the engine room of SHPP Hubelj (a small hydro power plant) in Ajdovščina -- 3 roof segments at different azimuths (45 deg/8 deg incline for 20.8 kWp; 306 deg/11 deg incline for 33.92 kWp; 319 deg for 16.32 kWp -- these 3 sub-figures sum to 71.04 kWp, consistent with the detail-section total, not the table figure). Grid: 0.4/20kV Elektro Primorska substation in the SHPP Hubelj yard.

Izvor podataka: https://www.hse.si/en/hse-projects/solar-power-plant/

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik SENG - Soške elektrarne Nova Gorica d.o.o. (HSE Group) Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.