☀ Solar · Operational
SPP Hubelj
55 kWp
6 MWh/mo
Pušteno u pogon
2020
CAPACITY DISCREPANCY -- LARGE, NOT COSMETIC, FLAGGED PROMINENTLY: HSE's own summary table gives 55 kWp, but that same page's detail-section HEADER says "71.04 kWp", and the module math confirms the larger figure exactly (222 single-crystal modules x 320 Wp = 71,040 W = 71.04 kWp) -- a 29% gap between HSE's own two numbers on the same page, NOT a rounding artifact like Dravograd/ OCV3/Gimnazija Velenje above. Per this project's established convention (table figure as the primary CapacityKw field even when the source disagrees with itself -- same handling as the Hrvatske vode small-hydro import's Pleternica/Fajerov Mlin/Dabrova Dolina/Brodski Drenovac discrepancies), CapacityKw = 55 kWp (the table figure). REVIEW THIS if a more authoritative capacity is ever found -- the 71.04 kWp figure is not a fabrication, it is HSE's own stated number for the same plant. Annual production 73 MWh/yr (0.073 GWh) -> MonthlyMwh = 73/12 = 6.08. Located on the roof of the engine room of SHPP Hubelj (a small hydro power plant) in Ajdovščina -- 3 roof segments at different azimuths (45 deg/8 deg incline for 20.8 kWp; 306 deg/11 deg incline for 33.92 kWp; 319 deg for 16.32 kWp -- these 3 sub-figures sum to 71.04 kWp, consistent with the detail-section total, not the table figure). Grid: 0.4/20kV Elektro Primorska substation in the SHPP Hubelj yard.
Izvor podataka: https://www.hse.si/en/hse-projects/solar-power-plant/
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | SENG - Soške elektrarne Nova Gorica d.o.o. (HSE Group) | Unclaimed |