☀ Solar · Operational
SPP Zlatoličje, Segment 5
2,5 MWp
250 MWh/mo
Pušteno u pogon
2022
Source (HSE): summary-table capacity 2,500 kWp (2.5 MWp), matching 5,694 photovoltaic modules at nominal power 2.5 MWp. Annual production 3,000 MWh/yr (3 GWh) -> MonthlyMwh = 3000/12 = 250.00. Ground-mount along the left bank of the Zlatoličje outflow canal, 905 metres long, running from the canal bridge to a karting track -- same HE Zlatoličje site as row 3 above, no separate coordinate published for this specific 905m stretch, so the plant-level HE Zlatoličje coordinate is used as a site estimate. Built by HTZ Velenje (a sheltered workshop, part of HSE Group -- effectively the EPC/contractor for this segment; no PlantPartyClaim/Partner row added here, see script header). DISTINCTIVE: central inverter + substation + MV switchyard are all housed together in a single container. PLANNED CONTEXT (not this row's capacity): HSE's page describes this segment as part of a larger PLANNED complex across both the Zlatoličje and Formin HPP canals, with a stated total projected nominal power of 30 MWp -- recorded here as a stated future plan only; this row's CapacityKw (2,500 kWp) reflects only the actually-built Segment 5.
Izvor podataka: https://www.hse.si/en/hse-projects/solar-power-plant/
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | Dravske elektrarne Maribor d.o.o. (HSE Group) | Unclaimed |