💧 Hydro · Operational
mHE Pamučna industrija Duga Resa
1,1 MW
Tip postrojenja
Run-of-river
Source: Hrvatske vode PUVP3 (rijeka Mrežnica, pribranska/protočna). HIGH confidence: direct name match -- this is the historic cotton-factory ("Pamučna industrija Duga Resa") hydro plant built 1884 in the town of Duga Resa itself, on the Mrežnica (Croatian Wikipedia, tehnika.lzmk.hr Hrvatska tehnička enciklopedija). Expanded 1937 with additional turbines + a steam turbine; today 4 water turbines, 3 synchronous generators, installed capacity 1.1 MW -- exact match to this row, ~2.01 GWh/year production (2008 figure). Owned today by "Pamučna industrija Duga Resa" the textile company itself, in bankruptcy per Wikipedia -- matches this row's owner exactly.
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | Pamučna industrija Duga Resa | Unclaimed |