💧 Hydro · Operational
mHE Dabrova Dolina 1
250 kW
Tip postrojenja
Run-of-river
Source: Hrvatske vode PUVP3 (rijeka Mrežnica, derivacijska/protočna). HIGH confidence: the building permit itself (tounj.hr, "Građevinska dozvola za građenje male hidroelektrane pod nazivom Dabrova dolina 1 na rijeci Mrežnici (Mlinica u Šušnjarima) u naselju Tržić Tounjski") names the exact site -- an old mill ("Mlinica u Šušnjarima") in Tržić Tounjski, Općina Tounj, within a Mrežnica Natura 2000 protected tufa-barrier area; became environmentally controversial after construction (Bankwatch reporting) for taking more water than the old channel and drying the Šušnjar waterfall in 2017. Exact company match (Kelemen energija d.o.o., financed via a 2015 EBRD-backed PBZ loan); HROTE's own contract list gives 225 kW planned, a minor discrepancy from this row's 250 kW, not resolved.
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | Kelemen energija d.o.o. | Unclaimed |