Preskoči na glavni sadržaj

💧 Hydro · Operational

mHE Dabrova Dolina 1

Tounj, Croatia
Investitor:Kelemen energija d.o.o.

250 kW

Tip postrojenja

Run-of-river

Source: Hrvatske vode PUVP3 (rijeka Mrežnica, derivacijska/protočna). HIGH confidence: the building permit itself (tounj.hr, "Građevinska dozvola za građenje male hidroelektrane pod nazivom Dabrova dolina 1 na rijeci Mrežnici (Mlinica u Šušnjarima) u naselju Tržić Tounjski") names the exact site -- an old mill ("Mlinica u Šušnjarima") in Tržić Tounjski, Općina Tounj, within a Mrežnica Natura 2000 protected tufa-barrier area; became environmentally controversial after construction (Bankwatch reporting) for taking more water than the old channel and drying the Šušnjar waterfall in 2017. Exact company match (Kelemen energija d.o.o., financed via a 2015 EBRD-backed PBZ loan); HROTE's own contract list gives 225 kW planned, a minor discrepancy from this row's 250 kW, not resolved.

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik Kelemen energija d.o.o. Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.