💧 Hydro · Operational
mHE Cabranka 1
Prezid, Croatia
Koordinate: približne (razina grada)
Investitor:Eucon d.o.o.
1,26 MW
Source: Hrvatske vode PUVP3 (vodotok Cabranka, scheme/mode nepoznato/unknown in source -- Scheme left NULL). HIGH-MEDIUM confidence: HROTE's own public "nositelji projekata" contract list (multiple dated snapshots, e.g. stanje na dan 28.07.2017) confirms "EUCON d.o.o. Mala hidroelektrana Čabranka 1" at 1,300 kW planned power -- exact company match and a close capacity match to this row's 1,260 kW installed. Same Čabranka river/Gorski kotar area as the other Cabranka rows above; no exact plant coordinates published, Prezid used as a town-level estimate.
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | Eucon d.o.o. | Unclaimed |