💧 Hydro · Operational
mHE Cabranka 2
30 kW
Source: Hrvatske vode PUVP3 (vodotok Cabranka, scheme/mode nepoznato/unknown in source -- Scheme left NULL). MEDIUM confidence: Finvest corp d.d. is registered in Čabar (fininfo.hr); capacity (30 kW) matches the documented "Finvest II" micro-hydro unit (0.03 MW) in the Finvest complex on the Čabranka, originally built by Finvest d.o.o. (Marijan Filipović, 1991) -- Finvest corp d.d. self-describes as successor to that history (finvestcorp.hr). Registry/press also ties Finvest's factory operations to Prezid (epirh.com) -- physical-site-over-registered-seat used here, consistent with this project's established convention. No exact plant coordinates published; Prezid is a town-level estimate near the Slovenian border in Gorski kotar.
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | Finvest corp d.d. | Unclaimed |