Preskoči na glavni sadržaj

💧 Hydro · Operational

CS Buško Blato

Tomislavgrad, Bosnia and Herzegovina
Koordinate: približne (razina grada)
Investitor:HEP

10,5 MW

Pušteno u pogon

1974

Tip postrojenja

Pumped-storage

Turbina

Kaplan

Broj jedinica

3

Protok

69,90 m³/s

Akumulacija

Buško jezero

Volumen akumulacije

800,00 hm³

Centar proizvodnje Dalmacija

Reversible pumping station (crpna stanica), functionally paired with HE Orlovac though organized as a separate company (CS Busko Blato d.o.o.). 3 Kaplan pump-turbines, each rated 1.65/3.5 MW in turbine mode and -1.6/-3.4 MW in pump mode (used the higher per-unit turbine-mode figure x3 = 10.5MW here as CapacityKw). Combined flow 3x23.3 m3/s (matches HE Orlovac's intake). Busko jezero (Busko Blato lake) is 800 hm3 / 57 km2, one of Europe's largest artificial lakes (~1/3 in the Livno municipality, ~2/3 in Tomislavgrad) -- mostly in Bosnia-Herzegovina, hence Country=Bosnia and Herzegovina here despite CS Busko Blato's functional role in the Croatian Cetina hydro system. Also uses the smaller Mandak (3.5 hm3) and Lipa (1.38 hm3 usable) basins, sharing the 12,100m tunnel to HE Orlovac. Commissioned 1974. Coordinates are a town-level estimate (Tomislavgrad, near the Busko Blato reservoir), not plant-exact.

Izvor podataka: https://www.hep.hr/proizvodnja/hidroelektrane-1528/pp-he-jug/cs-busko-blato/1553

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik HEP Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.