☀ Solar · Operational
Sunčana elektrana Korlat
99 MWp
13.750 MWh/mo
Pušteno u pogon
2026
Trošak izgradnje
€70.000.000
Financiranje
Kredit EBRD/EIB (EBRD/EIB loan)
Part of the hybrid Korlat energy park, built on the site of the existing VE Korlat wind farm and sharing its grid infrastructure. Roughly 150 ha gross site area, connects via the existing TS 33/110 kV Korlat substation to the 110 kV transmission network. Financed by EBRD and EIB loans. Construction reports published monthly since Nov 2024; expected start of operation 2026. Cross-confirmed operational as of 2026-07-16 via HEP's "Neintegrirane sunčane elektrane" aggregate listing page, which now describes this plant as "Operational (since June 2026)".
Izvor podataka: https://www.hep.hr/projekti/obnovljivi-izvori-energije/suncana-elektrana-korlat/3792