Preskoči na glavni sadržaj

💧 Hydro · Operational

HE Orlovac

Ruda, Croatia
Koordinate: približne (razina grada)
Investitor:HEP

237 MW

29.420 MWh/mo

Pušteno u pogon

1973

Tip postrojenja

Reservoir

Turbina

Francis

Broj jedinica

3

Pad

380,0 m

Protok

69,90 m³/s

Akumulacija

Buško Blato / Lipa

Volumen akumulacije

800,00 hm³

Centar proizvodnje Dalmacija

High-head reservoir derivation plant, part of GHE Orlovac. 3 main Francis units (3x79MW = 237MW) plus 1 small 1MW Pelton "house" auxiliary unit not counted in HEP's technical-data table's turbine tally. Combined main flow 3x23.3 m3/s. Linked to the Busko Blato reservoir (800 hm3, mostly in Bosnia-Herzegovina) via the Lipa compensation basin and a 12,100m headrace tunnel (dia. 5.5m) shared with CS Busko Blato's pumping station. Average annual production ~353 GWh. Coordinates are a town-level estimate (Ruda, near Trilj), not plant-exact.

Izvor podataka: https://www.hep.hr/proizvodnja/hidroelektrane-1528/pp-he-jug/he-orlovac/1552

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik HEP Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.