60 MW
Pušteno u pogon
1960
Tip postrojenja
Reservoir
Turbina
Francis
Broj jedinica
2
Protok
120,00 m³/s
Akumulacija
Peruča
Volumen akumulacije
565,00 hm³
Visina brane
65,0 m
Centar proizvodnje Dalmacija
Reservoir dam-toe plant on the Cetina, part of GHE Orlovac. Peruca Lake is the largest reservoir in Croatia (565 hm3 usable). Dam 65m high, built 1958. Originally 41.6 MW when commissioned in 1960; capacity is 61.2 MW per HEP's narrative text / 60 MW per the technical-data table after a 2004-2008 revitalization -- used the table figure here, discrepancy noted. The dam was mined and damaged during the 1991-95 war (January 1993) and was repaired, with the crest raised 1.5m, by 1995. No production figure stated on HEP's page. Coordinates are a town-level estimate (Satric, near Vrlika/the Peruca reservoir), not plant-exact.
Izvor podataka: https://www.hep.hr/proizvodnja/hidroelektrane-1528/pp-he-jug/he-peruca/1551
Strane i prijave uloga
1| Uloga | Tvrtka | Status | Preuzeo/la | Radnje |
|---|---|---|---|---|
| Vlasnik | HEP | Unclaimed |