💧 Hydro · Operational

HE Jaruga

Skradin, Croatia
Koordinate: približne (razina grada)
Investitor:HEP

7,3 MW

2.917 MWh/mo

Pušteno u pogon

1903

Tip postrojenja

Run-of-river

Turbina

Francis

Broj jedinica

2

Pad

26,0 m

Protok

31,00 m³/s

Centar proizvodnje Dalmacija

The first hydroelectric plant in Europe and the second oldest in the world -- began operating 28 August 1895 (two days after the Adams Power Plant at Niagara Falls), moved to its current location in 1903. Part of GHE Miljacka on the Krka, near the Skradinski buk waterfalls. Pure run-of-river with NO flow-regulation capability. 2 Francis "barrel-in-barrel" units, combined 2x15.5 m3/s. Capacity stated as 7.3 MW in HEP's narrative text, 7.2 MW elsewhere on the same page -- a minor discrepancy left unresolved. Average annual production ~35 GWh. Rebuilt 1916, 1937, 1974, 1995, 2002-03. Commissioning-year table field was blank on HEP's page; 1903 (current-site rebuild) used here per HEP's own narrative. Coordinates are a town-level estimate (Skradin), not plant-exact.

Izvor podataka: https://www.hep.hr/proizvodnja/hidroelektrane-1528/pp-he-jug/he-jaruga/1550

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik HEP Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.