Preskoči na glavni sadržaj

💧 Hydro · Operational

HE Golubić

Golubić, Croatia
Koordinate: približne (razina grada)
Investitor:HEP

6,54 MW

2.375 MWh/mo

Pušteno u pogon

1981

Tip postrojenja

Reservoir

Turbina

Francis

Broj jedinica

2

Protok

7,00 m³/s

Visina brane

11,0 m

Centar proizvodnje Dalmacija

High-head derivation plant on the Krka system, part of GHE Miljacka (with Golubic, Krcic, Miljacka and Jaruga grouped under one production unit). 2 Francis units, 3.27 MW each. Concrete dam 43.7m long / 11m high, embankments 1,300m, compensation basin ~187,000 m3. 0.5 m3/s biological minimum. Average annual production ~28.5 GWh. Coordinates are a town-level estimate (Golubic village near Knin), not plant-exact.

Izvor podataka: https://www.hep.hr/proizvodnja/hidroelektrane-1528/pp-he-jug/he-golubic/1549

Strane i prijave uloga

1
UlogaTvrtkaStatusPreuzeo/laRadnje
Vlasnik HEP Unclaimed

Ponovno povezivanje sa serverom...

Pokušaj ponovnog povezivanja. Sljedeći pokušaj za sekundi.

Povezivanje nije uspjelo.
Pokušajte ponovno ili ponovno učitajte stranicu.

Sesija je pauzirana.

Nastavak nije uspio.
Pokušajte ponovno ili ponovno učitajte stranicu.